Tag: Electrical
More detail on the catchment area, and it looks like they're making the spillway for overflow.
Also saw they're putting in the pipes for running electricity and cable.

Spillway looks about done, with two drainage pipes and starting to fill with sand.
They're also working on the roadway drainage to the stormwater pool.
