189 Bunker Hill, Stratham, NH 03885

Archive

Showing 21 to 30 of 36 results

Spillway looks about done, with two drainage pipes and starting to fill with sand.

They're also working on the roadway drainage to the stormwater pool.

roadway

More detail on the catchment area, and it looks like they're making the spillway for overflow.

Also saw they're putting in the pipes for running electricity and cable.

roadway

They've started digging out the catchment basement for the stormwater runoff from the roadway.

The roadway is also looking a lot more complete - they might have all the pipes in there, didn't catch them.

roadway

The big rock is still there, but they have excavated around it.

More levelling for the turning circle, with the roller vibrating and shaking our house.

Friday afternoon when the construction workers have gone home the wildlife reappears.

Nothing much has changed, apart from more hammering of large rocks.

Also some levelling of the turning circle.

turning circle

Nothing more was heard for several minutes; but then there came out of the depths faint knocks: tom-tap, tap-tom. They stopped, and when the echoes had died away, they were repeated: tap-tom, tom-tap, tap-tap, tom. They sounded disquietingly like signals of some sort; but after a while the knocking died away and was not heard again.

‘That was the sound of a hammer, or I have never heard one,’ said Gimli.

The Lord of the Rings, Book II, Chapter 4: “A Journey in the Dark”

Maybe they're making a radio telescope dish instead?

More removal of top soil for road. That rock looks the size of a truck!

Bulldozer has begun removing topsoil for the roadway. Old house is still being demolished.